SEAMS News Archives

Vallance Byways May 2017

by Ian Sampson

This event was the second running of the Lightning, some weeks ago at the first running only one engine fired up, so at the second attempt on the 20th May both engines ran, I left home around 10.30 and picked up John and Heather when we got there we had a look around the museum, and as the running was not until 1pm we walked around the corner to the pub and had a very nice lunch and drinks not going into what we had but very good cheap prices with good portions back to Vallance for the 1pm running both engines worked well and ran for about 15 minutes till shut down, nice event although a bit noisy, the next event should be on the 5th August with possibly both Shackleton and Lightning running, keep an eye on their website.